12 men and 13 boys can earn 326.25 in 3 days. 5 men and 6 boys can earn 237.50 in 5 days. In how many days will 3 men and 4 boys earn 210?
ATMA - 2021
ATMA
Quantitative Aptitude
Time and Work
Team members can complete a job in 20 days but with the help of their team leader, they can complete it in 15 days. In how many days can the team leader alone complete the job?
ATMA - 2021
ATMA
Quantitative Aptitude
Time and Work
6 men can build a wall in 2 days. 8 women can build this wall in 3 days. In how many days the wall gets build if 3 men and 6 women work together?
ATMA - 2021
ATMA
Quantitative Aptitude
Time and Work
Karim can finish a work alone in T days. Manu can do so in 2T days. If they work together, they finish the work in 6 days. What is the value of T?
ATMA - 2021
ATMA
Quantitative Aptitude
Time and Work
A water tank gets filled in 2 hours when it is filled at 2 litres per minute. If there is a leakage at the bottom of tank that drains water at 1 litre every 2 minutes, then how much time will it take to fill the tank?
ATMA - 2021
ATMA
Quantitative Aptitude
Time and Work
A boy eats 12 burgers in an hour. How many burgers will 8 boys eat in 20 minutes?
ATMA - 2021
ATMA
Quantitative Aptitude
Time and Work
A and B together can finish a piece of work in 20 days. If A alone can finish the work in 30 days, then in how many days can B alone finish the same work?
ATMA - 2021
ATMA
Quantitative Aptitude
Time and Work
A is 6.5 times as good workman as B. Together they finish the work in 3 days. In how many days approximately A alone can do it?
ATMA - 2021
ATMA
Quantitative Aptitude
Time and Work
A can do a job in 9.8 days and B can do it in 14 days. They work together for 3.5 days, and A goes away. In how many days will B finish the remaining work?
ATMA - 2021
ATMA
Quantitative Aptitude
Time and Work
A, B and C can do a piece of work in 40, 60 and 120 days respectively. In how many days can A, B and C together finish the work?
ATMA - 2021
ATMA
Quantitative Aptitude
Time and Work
A can do a piece of work in 10 days and B can do the same piece of work in 15 days. In how many days can A and B together finish the work?
ATMA - 2021
ATMA
Quantitative Aptitude
Time and Work
A cistern can be filled in 25 minutes. There is a leakage which can empty it in 50 minutes. In how many minutes
KMAT KERALA - 2021
KMAT KERALA
Quantitative Aptitude
Time and Work
A task is done by 46 persons not all of them have the same capacity to task. Every day exactly 2 persons, do ti together twice. Even after all possible pairs have worked once, all the persons together works for two more days to finish the the persons together will finish the whole task?
KMAT KERALA - 2021
KMAT KERALA
Quantitative Aptitude
Time and Work
3 faucets A,B,C can fill a cistern from empty to full in 45mins, 35mins, and 25 mins respectively. When the cistE Faucets A,B,C discharge chemical solutions X,Y,Z respectively. What is the proportion of solution Zin the liquid in the tank af
KMAT KERALA - 2021
KMAT KERALA
Quantitative Aptitude
Time and Work
A group of men decided to do a job in 4 days. But since 20 men dropped out everyday, the job was completed were there at the beginning ?
KMAT KERALA - 2021
KMAT KERALA
Quantitative Aptitude
Time and Work
Three men and 5 women together can finish a job in 3 days. Working on the same job 3 women take 5 days m the ratio of efficiency of a man to a woman?
KMAT KERALA - 2021
KMAT KERALA
Quantitative Aptitude
Time and Work
Four pipes A, B,C and D can fill a cistern in 20, 25, 40 and 50 hours respectively. If A and B are opened as inle as outlet pipes from the cistern and all the four pipes are opened simultaneously, how many hours will take to fill the cistern c
KMAT KERALA - 2021
KMAT KERALA
Quantitative Aptitude
Time and Work
A can do a piece of work in 24 days. If B is 60 % more efficient than A, then the number of days required by B to complete the work:
KMAT KERALA - 2021
KMAT KERALA
Quantitative Aptitude
Time and Work
Water is flowing at the rate of 4 km/h through a pipe of radius 7 cm into a rectangular tank with length and breadth as 25 m and 22 m, respectively. The time (in hours) in which the level of water in the tank will rise by 28 cm is (take \( \pi = \frac{22}{7} \)):
NPAT - 2020
NPAT
Quantitative Aptitude
Time and Work
Water is flowing at the rate of 4 km/h through a pipe of radius 7 cm into a rectangular tank with length and breadth as 25 m and 22 m, respectively. The time (in hours) in which the level of water in the tank will rise by 28 cm is (take \( \pi = \frac{22}{7} \)):
NPAT - 2020
NPAT
Quantitative Aptitude
Time and Work
Water is flowing at the rate of 4 km/h through a pipe of radius 7 cm into a rectangular tank with length and breadth as 25 m and 22 m, respectively. The time (in hours) in which the level of water in the tank will rise by 28 cm is
\[ \text{(take } \pi = \frac{22}{7}) \]
NPAT - 2020
NPAT
Quantitative Aptitude
Time and Work
A can do a piece of work in 80 days. He works at it for 10 days and then B alone finishes the remaining work in:
KMAT KERALA - 2020
KMAT KERALA
Quantitative Aptitude
Time and Work
A builder engages 25 men working 8 hours a day to build an apartment in 4 weeks. At the end of 12 days, how many more men should be engaged so that all the men working 10 hours a day may complete the apartment in the stipulated time?
KMAT KERALA - 2020
KMAT KERALA
Quantitative Aptitude
Time and Work
Ramesh and Ravi can complete a job in 16 days. Ramesh alone can do it in 24 days. How long will Ravi :
KMAT KERALA - 2020
KMAT KERALA
Quantitative Aptitude
Time and Work
Two pipes A and B can separately fill a cistern in 25 minutes and 35 minutes, respectively. If a waste pipe is opened when the cistern is full, it is emptied in 175 minutes. How many litres does the cistern hold
KMAT KERALA - 2020
KMAT KERALA
Quantitative Aptitude
Time and Work