Mining Engineering
List of top Mining Engineering Questions on Mine Surveying
Identify the correction to departure of any side in traversing.
TS PGECET - 2026
TS PGECET
Mining Engineering
Mine Surveying
An area of \(100\,\text{m}^2\) is measured on a plan having an R.F. of \(\dfrac{1}{800}\). If the R.F. were changed to \(\dfrac{1}{2000}\), the area on the new plan in \(\text{m}^2\) would be
TS PGECET - 2026
TS PGECET
Mining Engineering
Mine Surveying
Random errors are best minimized by
TS PGECET - 2026
TS PGECET
Mining Engineering
Mine Surveying
The magnetic bearing of a line AB is \(S\,32^\circ E\) and the magnetic declination is \(4^\circ E\). What is the true bearing of the line AB?
TS PGECET - 2026
TS PGECET
Mining Engineering
Mine Surveying
A transition curve is provided to
TS PGECET - 2026
TS PGECET
Mining Engineering
Mine Surveying
In the etch method, the acid used to measure borehole deviation is
TS PGECET - 2026
TS PGECET
Mining Engineering
Mine Surveying
An area of \(100\,\text{m}^2\) is measured on a plan having an R.F. of \(\dfrac{1}{800}\). If the R.F. were changed to \(\dfrac{1}{2000}\), the area on the new plan in \(\text{m}^2\) would be
TS PGECET - 2026
TS PGECET
Mining Engineering
Mine Surveying
Random errors are best minimized by
TS PGECET - 2026
TS PGECET
Mining Engineering
Mine Surveying
The magnetic bearing of a line AB is \(S\,32^\circ E\) and the magnetic declination is \(4^\circ E\). What is the true bearing of the line AB?
TS PGECET - 2026
TS PGECET
Mining Engineering
Mine Surveying
A transition curve is provided to
TS PGECET - 2026
TS PGECET
Mining Engineering
Mine Surveying
In the etch method, the acid used to measure borehole deviation is
TS PGECET - 2026
TS PGECET
Mining Engineering
Mine Surveying
Identify the correction to departure of any side in traversing.
TS PGECET - 2026
TS PGECET
Mining Engineering
Mine Surveying
In an area to be surveyed the line which covers entire area to be surveyed and has to be measured very accurately is
AP ECET Mining Engg - 2025
AP ECET Mining Engg
Mining Engineering
Mine Surveying
The area of plan is 10 cm\(^2\) drawn to a scale of 1 cm = 10m. The area measured on the ground is
AP ECET Mining Engg - 2025
AP ECET Mining Engg
Mining Engineering
Mine Surveying
Given scale on a map is 1 cm = 20m then its Representative Factor (RF) is
AP ECET Mining Engg - 2025
AP ECET Mining Engg
Mining Engineering
Mine Surveying
The angle in degrees at which a ridge line intersects contours is
TS PGECET - 2024
TS PGECET
Mining Engineering
Mine Surveying
The basic concept behind GPS is
TS PGECET - 2024
TS PGECET
Mining Engineering
Mine Surveying
Every line has two bearings such as fore bearing and back bearing. If fore bearing is less than $180^\circ$, then what will be the back bearing?
TS PGECET - 2024
TS PGECET
Mining Engineering
Mine Surveying
One of the tacheometric constants is additive, the other constant is
TS PGECET - 2024
TS PGECET
Mining Engineering
Mine Surveying
The length of the tangent of a simple circular curve of radius $R$ and angle of deflection $\Delta$ is given by
TS PGECET - 2024
TS PGECET
Mining Engineering
Mine Surveying