List of top Mine Planning Questions on Ultimate pit configuration and its determination

In an open pit mine, the mineral inventory, prices, costs and capacities are given.
the mineral inventory
Concentrating cost: INR 3,200/tonne of ore milled
Smelting & refinery cost: INR 10,000/tonne of copper metal
Selling price: INR 6,50,000/tonne of copper metal
Overall recovery: 100%
Maximum production capacity: 5 million tonne/annum
The mine is operating at 5 million tonne in a year. Considering mining capacity being the only constraint, Lanes' algorithm (based on profit maximization) is used for determining mill cut-off grade. The total amount of copper produced in million tonne, in the life of the pit, is____.(round off up to 2 decimals)