List of top Mine Planning Questions on Determination of mine size and mine life

Four identical districts of a mine are ventilated with a quantity of 3500 m3/min at a fan drift pressure of 1.15 kPa. When one of the districts is sealed off, the change in resultant resistance is 0.072 Ns2m-8. If the fan is stopped, keeping a district sealed, the quantity through the mine becomes 850 m3/min. The natural ventilation pressure in Pa, is
  • GATE MN - 2024
  • GATE MN
  • Mine Planning
  • Determination of mine size and mine life

The grade-tonnage distribution for the ultimate pit of a mine is given below. 

\[ \begin{array}{|c|c|} \hline \text{Cu grade (\%)} & \text{Cumulative million tonnes below the grade} \\ \hline 0.1 & 0 \\ 0.4 & 15.0 \\ 0.5 & 17.0 \\ 0.6 & 18.0 \\ 0.7 & 19.0 \\ 0.9 \text{ and above} & 23.0 \\ \hline \end{array} \] 

The mill cut-off grade is 0.5% Cu. The annual mining capacity (ore + waste) is 4.5 million tonne and milling capacity is 1.0 million tonne. Excavation is planned in such a way that either the mine or the mill runs at full capacity throughout. The planned life of the mine, in years, is \(\underline{\hspace{1cm}}\). (round off to one decimal place)

  • GATE MN - 2021
  • GATE MN
  • Mine Planning
  • Determination of mine size and mine life