Question:

Which of the following are the major diversion works completed during the period 1836 to 1866?
A. Upper Ganga Canal
B. Mutha Canal
C. Upper Bari-Doab Canal
D. Krishna Delta
Choose the correct answer from the options given below

Show Hint

The Upper Ganga Canal (1854) and Sir Arthur Cotton's Krishna Delta Anicut (1855) are two of the most famous British-era irrigation structures, both built in the mid-19th century.
  • A, B and D only
  • B, C and D only
  • A, C and D only
  • A, B and C only
Show Solution
collegedunia
Verified By Collegedunia

The Correct Option is C

Solution and Explanation

Step 1: Understanding the Concept:
The period between 1836 and 1866 was a highly active era of irrigation engineering in India, during which several landmark river diversion works and massive canal systems were completed.

Step 2: Detailed Explanation:

Let us verify the completion dates of the listed projects:
- A. Upper Ganga Canal: Designed by Sir Proby Cautley, construction commenced in 1842 and the canal was opened in 1854. This lies within the 1836-1866 window.
- B. Mutha Canal: The Khadakwasla Dam and associated Mutha Canal project in Pune were constructed later, starting around 1869 and completed in 1879. This lies outside the 1836-1866 window.
- C. Upper Bari-Doab Canal: Built to divert water from the Ravi River in Punjab, this major work was completed and opened in 1859, placing it within the specified period.
- D. Krishna Delta System: The Bezwada Anicut across the Krishna River was designed and constructed by Sir Arthur Cotton between 1852 and 1855, placing it within the specified period.
Therefore, projects A, C, and D were completed between 1836 and 1866.

Step 3: Final Answer:

The correct combination is A, C and D only.
Was this answer helpful?
0
0