Productivity = (Cu concentration - background concentration) × Catchment area
Step 2: Applying the values.
Productivity = (3000 - 200) × 10 × 10^6 = 2800 × 10^6 ppm·m² = 2.8 × 10^9 ppm·m²
Therefore, the productivity is \(2.8 \times 10^9\) ppm·m², matching option (B).
In the isochemical phase diagram shown below, the curved arrow represents the P-T path. The variance at peak metamorphism is _. 