The Whole Circle Bearing (WCB) of line AB is \(150^{\circ}\). The length of AB is 100 m. The latitude and departure values, respectively, for this line are:
  • GATE CE - 2026
  • GATE CE
  • Geomatics Engineering
  • Traversing and triangulation survey
If the number of sides resulting in a closed traverse is increased from three to four, the sum of the interior angles increases by
  • GATE CE - 2024
  • GATE CE
  • Geomatics Engineering
  • Traversing and triangulation survey
Traversing is carried out for a closed traverse PQRS. The internal angles at vertices P, Q, R, and S are measured as 92°, 68°, 123°, and 77°, respectively. If fore bearing of line PQ is 27°, fore bearing of line RS (in degrees, in integer) is \(\underline{\hspace{1cm}}\).
  • GATE CE - 2021
  • GATE CE
  • Geomatics Engineering
  • Traversing and triangulation survey
For a given traverse, latitudes and departures are calculated and it is found that sum of latitudes is equal to +2.1 m and the sum of departures is equal to -2.8 m. The length and bearing of the closing error, respectively, are